Building-up of small hydroelectric power station on the river Laba

Project name Building-up of small hydroelectric power station on the river Laba
Location of the project Labinskiy district
Industry classification Fuel and energy complex
Basic information about the project
Project essence Chernorechensky SH└ES on the derivational channel from the river Laba will represent hydroknot for electric power development. Without dams SH└ES, using transformations of a stream of water to mechanical energy and further in electric energy, is pressure head HYDROELECTRIC POWER STATION.
Project capacity 7,5 ╠┬˛
Financial estimation of the project
Total cost of the project, mln rubles 111,658 million rbl
Investment capacity, mln rubles 111,658 million rbl
Conditions of investor participation Direct investments
Payback period 6,8 years
Land characteristics
Location Labinsk area, to the south of the item Chernorechensky
Land plot area (m2) 100000,0 m2
Ground categories The earths of an agricultural purpose
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply ┬╦ 10 kW˛ 500
Gas supply - -
Water supply 0,4 cubic m./hour 100
Sewerage system 0,4 cubic m./hour -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Labinsk city 80
Center of federal subject Krasnodar city 280
Highway (regional, federal significance) Krasnodar - Ahmetovsky 12
Roads of local significance Urban roads with asphalt and gravel a cover 0,5
Nearest railway station Station Labinsk 84
Nearest railway lines 43
Airport Krasnodar city 280
Seaport Tuapse city 260