Basic information about the project
Project essence The project provides building on the river Laba of the pumped storage station capacity 600 MW. The basic scheme of its work consists in change of two modes: energy accumulation during internal time during a curtailment on demand and return to its consumer at o'clock of demand maximum. A cycle of accumulation of the Labinsk pumped storage station - daily allowances.
Project capacity 600 ÌW
Financial estimation of the project
Total cost of the project, mln rubles 18 600 million rbl
Investment capacity, mln rubles 18 600 million rbl
Conditions of investor participation Direct investments
Payback period 15,9 years
Land characteristics
Location Labinsk area, 4,5 km. Above on a current of the river Laba from the item Zassovsky
Land plot area (m2) 3050000,0 m2
Ground categories The earths of an agricultural purpose
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply VL 10 kw 50,0
Gas supply -
Water supply 0,6 cubic m./hour 100,0
Sewerage system 0,6 cubic m./hour Within a taken away site
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Labinsk city 30
Center of federal subject Krasnodar city 230
Highway (regional, federal significance) Krasnodar - Ahmetovsky In territory of an asked site
Roads of local significance Urban roads with asphalt and gravel a cover -
Nearest railway station Station Labinsk 34
Nearest railway lines 0,1
Airport Krasnodar city 230