Project name |
Building of hydro-storage plant |
Location of the project |
Labinskiy district |
Industry classification |
Fuel and energy complex |
Basic information about the project |
Project essence |
The project provides building on the river Laba of the pumped storage station capacity 600 MW. The basic scheme of its work consists in change of two modes: energy accumulation during internal time during a curtailment on demand and return to its consumer at o'clock of demand maximum. A cycle of accumulation of the Labinsk pumped storage station - daily allowances. |
Project capacity |
600 ÌW |
Financial estimation of the project |
Total cost of the project, mln rubles |
18 600 million rbl |
Investment capacity, mln rubles |
18 600 million rbl |
Conditions of investor participation |
Direct investments |
Payback period |
15,9 years |
Land characteristics |
Location |
Labinsk area, 4,5 km. Above on a current of the river Laba from the item Zassovsky |
Land plot area (m2) |
3050000,0 m2 |
Ground categories |
The earths of an agricultural purpose |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 10 kw |
50,0 |
Gas supply |
- |
|
Water supply |
0,6 cubic m./hour |
100,0 |
Sewerage system |
0,6 cubic m./hour |
Within a taken away site |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Labinsk city |
30 |
Center of federal subject |
Krasnodar city |
230 |
Highway (regional, federal significance) |
Krasnodar - Ahmetovsky |
In territory of an asked site |
Roads of local significance |
Urban roads with asphalt and gravel a cover |
- |
Nearest railway station |
Station Labinsk |
34 |
Nearest railway lines |
|
0,1 |
Airport |
Krasnodar city |
230 |
Seaport |
Tuapse city |
210 |