Project name |
Construction of gas piston three-generation power station |
Location of the project |
Starominskiy district |
Industry classification |
Fuel and energy complex |
Basic information about the project |
Project essence |
Construction of gas piston three-generation power station capacity 20 MW, is caused by deficiency of power resources on territory of the municipal formation Starominsky district. Additional stimulus for construction is usage pair and hot water. |
Project capacity |
175200 ÌW è 181828 Gkal heat energy |
Financial estimation of the project |
Total cost of the project, mln rubles |
1136 |
Investment capacity, mln rubles |
1136 |
Conditions of investor participation |
Direct investments |
Payback period |
3,3 years |
Land characteristics |
Location |
The area of open joint-stock company «Starominsky elevator», western industrial zone, Starominskaya village, Krasnodar region |
Land plot area (m2) |
5000 |
Ground categories |
The Earth of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
No |
- |
Gas supply |
Gas main of the high pressure by diameter 325 mm |
400 |
Water supply |
No |
- |
Sewerage system |
No |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Starominskaya village |
|
Center of federal subject |
Krasnodar city Rostov - on - Don city |
180 120 |
Highway (regional, federal significance) |
Krasnodar - Yeisk Azov – Aleksandrovka –Starominskaya Starominskaya – Kuschevskaya Starominskaya – Leningradskaya – Pavlovskaya M4 «Don» |
0,2 4 10 3 56 |
Nearest railway station |
Starominskaya railway station 1 railway station 2 railway station |
1 2 |
Nearest railway lines |
railway line |
0,3 |
Airport |
Krasnodar city Rostov - on - Don city |
180 120 |
Seaport |
Yeisk city Azov city Novorossiysk city |
60 80 360 |