Project name |
Cultural and ethnic center in the village of Shaumian |
Location of the project |
Tuapsinskiy district |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
development of eco-ethnic tourism in the Tuapse District, raising the welfare of local people by creating new jobs. |
Project capacity |
27 000 people a year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
30.0 million rubles. |
Investment capacity, mln rubles |
30.0 million rubles. |
Conditions of investor participation |
direct investments |
Payback period |
3.75 years |
Land characteristics |
Location |
Krasnodar Region, Tuapsinsky District, Shaumian Village. |
Land plot area (m2) |
2 500.0 sq.m. |
Ground categories |
lands of settlements. |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
a high voltage line VL-10 |
500 m |
Gas supply |
not required |
|
Water supply |
d=0.50 |
1,000 m |
Sewerage system |
local treatment facilities |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Tuapse City |
50 km |
Center of federal subject |
Krasnodar City |
280 km |
Highway (regional, federal significance) |
Tuapse - Maikop |
0.01 km |
Roads of local significance |
|
0.01 km |
Nearest railway station |
Tuapse City |
50 km |
Nearest railway lines |
Tuapse City |
50 km |
Airport |
Krasnodar City |
280 km |
Seaport |
Tuapse City |
50 km |
Contact information |
Information on project proponent |
Administration of the Tuapsinsky District Municipality; tel.: +7 (86167) 2-36-13, +7 (86167) 2-10-91; naz.proekttuapse@mail.ru; www.tuapseregion.ru. Department of Complex Development of Resorts and Tourism of the Krasnodar Region; tel./fax: +7 ( |