Project name |
Construction of resort objects on the quay “Visokiy Bereg” |
Location of the project |
Anapa city |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
The project assumes accomplishment the quay “High coast” and construction of buildings in the beach and recreation zone. |
Project capacity |
There will be constructed three complexes, built in slope of High Coast: surfing center – 214 places; hotels complex – 280 places; hotel “Chernomorskiy” – 260 places |
Financial estimation of the project |
Total cost of the project, mln rubles |
2 080 |
Investment capacity, mln rubles |
2 080 |
Conditions of investor participation |
Direct investment |
Payback period |
10,2 |
Land characteristics |
Location |
the city-resort of Anapa |
Land plot area (m2) |
8 800 |
Ground categories |
Residential areas |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
SS110/10kW “Visokiy Bereg” |
1000 |
Gas supply |
Resort town of Anapa gas supply system, Krepostnaya st. |
200 |
Water supply |
Resort town of Anapa water supply system, Krepostnaya st. Kirova st. |
250 350 |
Sewerage system |
Resort town of Anapa sewerage system, Krepostnaya st. Kirova st. |
250 350 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
resort town of Anapa |
0 |
Center of federal subject |
city of Krasnodar |
160 |
Highway (regional, federal significance) |
Federal high way M-25 |
3,5 |
Roads of local significance |
Pionerskiy avenue |
0 |
Nearest railway station |
Railway station «Anapa» |
13 |
Nearest railway lines |
|
13 |
Airport |
Airport «Anapa» |
20 |
Seaport |
Sea port «Anapa» |
2 |