Project name |
Shelter of the fisherman and the hunter |
Location of the project |
Sherbinovskiy district |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
Within the limits of project realisation it is planned to render following types of service: - Residing - Winter and summer fishing - Hunting |
Project capacity |
Within the limits of project realisation building of 4 cottage small houses on 50 sq.m. with parking of vehicles is planned |
Financial estimation of the project |
Total cost of the project, mln rubles |
6,9 million rbl. |
Investment capacity, mln rubles |
6,9 million rbl. |
Conditions of investor participation |
Direct investments |
Payback period |
4,8 years |
Land characteristics |
Location |
Krasnodar territory, Shcherbinovsky area, southeast part has sat down Nikolavka |
Land plot area (m2) |
4 000 sq. m |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Vl-10 ê |
250 |
Gas supply |
It is not required |
It is not required |
Water supply |
d=150 Mm |
270 |
Sewerage system |
Local treatment facilities |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Village Staroshcherbinovsky |
15 |
Center of federal subject |
The city of Krasnodar |
238 |
Highway (regional, federal significance) |
Highway of regional value Krasnodar - Yeysk |
16 |
Roads of local significance |
Motorway Staroshcherbinovsky – Shabelsky |
1 |
Nearest railway station |
Railway station a village Staroshcherbinovsky |
15 |
Nearest railway lines |
Village Staroshcherbinovsky |
14.5 |
Airport |
The city of Yeysk |
55 |
Seaport |
The city of Yeysk |
53 |