Project name |
Construction of multipurpose recreational complex |
Location of the project |
Sochi city |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
Construction of Luxe Class Hotel with a sports complex and entertainment complex |
Project capacity |
Hotel of 27 500m? on a land plot of 15 600 m?, number of floors - 25 floors, room stock – 240 |
Financial estimation of the project |
Total cost of the project, mln rubles |
1 412,728 |
Investment capacity, mln rubles |
1 412,728 |
Conditions of investor participation |
Investor’s Direct Investments |
Basic indicators of investment project economic efficiency |
Simple payback time |
9,7 |
Land characteristics |
Location |
Krasnodar region, Sochi, Lazarevsky district, Sibirskaya street |
Land plot area (m2) |
15600 |
Ground categories |
Settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
1400 Kilowatt II category |
6100 |
Gas supply |
- |
- |
Water supply |
510 m3 (D-300 mm) |
150 |
Sewerage system |
470 m3 |
Local treatment plants |
Telephone penetration |
1 point |
360 |
Cost of maintenance of ground area with engineering infrastructure (million rubles) |
Water Supply – 140,3, Water Drainage – 176,3, Gas Supply - , Heat Supply - 15,0, Power Supply – 18,2, Telephone Radio - 0,1, Total: 349,9 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Sochi Post Office |
62,5 |
Center of federal subject |
Krasnodar |
300 |
Highway (regional, federal significance) |
M27 |
26 |
Nearest railway station |
Sochi Station |
62 |
Airport |
Adler |
102 |
Seaport |
Sochi Seaport |
63 |