Construction of multipurpose recreational complex

Project name Construction of multipurpose recreational complex
Location of the project Sochi city
Industry classification Resorts and tourism
Basic information about the project
Project essence Construction of multipurpose recreational complex featuring: hotel complex, trade complex, sports complex, aqua park, restaurants, outdoor parking lots and play grounds.
Project capacity Multifunctional recreational complex of 3900 m? on a land plot of 8400 m?, number of floors - 3 floors, capacity – 50 (100 tourists).
Financial estimation of the project
Total cost of the project, mln rubles 420,5
Investment capacity, mln rubles 420,5
Conditions of investor participation Investor’s Direct Investments
Basic indicators of investment project economic efficiency
Simple payback time 7,6
Land characteristics
Location Krasnodar region, Sochi, Lazarevsky district, Turistskaya street
Land plot area (m2) 8400
Ground categories Settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 1150 Kilowatt II caterory 5000
Gas supply 176 m3 8000
Water supply 275 m3 (D 500) 6000
Sewerage system 252 m3 Local treatment plants
Telephone penetration 20 points 150
Cost of maintenance of ground area with engineering infrastructure (million rubles) Water Supply – 75,6, Water Drainage - 94,5, Gas Supply – 24, Heat Supply - 15, Power Supply – 15, Telephone Radio – 0,1. Total: 224,2
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Sochi Post Office 57,5
Center of federal subject Krasnodar 195
Highway (regional, federal significance) M27 0,127
Nearest railway station Sochi Station 57
Airport Adler 97
Seaport Sochi Seaport 58