Construction of motel on 35 places in item Psebay

Project name Construction of motel on 35 places in item Psebay
Location of the project Mostovskoy district
Industry classification Resorts and tourism
Basic information about the project
Project essence Maintenance of need of visitors and inhabitants of area hotel services.
Project capacity 35 nimbus 1400 m. kv.
Financial estimation of the project
Total cost of the project, mln rubles 44,5 million ruble
Investment capacity, mln rubles 44,5 million ruble
Conditions of investor participation Direct investments
Payback period 3,6 years
Land characteristics
Location Krasnodar territory, area Mostovsky, item Psebay (area SOSH 20)
Land plot area (m2) 2000,00
Ground categories The Earth of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Electric line – 10 kw 600
Gas supply d=57-76 mm; 300
Water supply d=150 mm; 350
Sewerage system d=150 mm; 300
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Mostovskoj town
Center of federal subject Krasnodar city
Highway (regional, federal significance) Labinsk city - Mostovskoj town – Border of Karachaevo Circassian republic 3
Roads of local significance Mostovskoj - Psebaj 0,1
Nearest railway station Shedok 10
Nearest railway lines Shedok 10
Airport Krasnodar city 270
Seaport Tuapse city 280