Project name |
Construction of multipurpose recreational complex |
Location of the project |
Sochi city |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
Construction of multipurpose recreational complex featuring: hotel complex, trade complex, sports complex, aqua park, restaurant, outdoor parking lots and play grounds. The complex is intended for leisure and health improvement. The Project features the execution of works on engineering and communications networks, landscaping on adjacent territory. |
Project capacity |
Multifunctional recreational complex of 3060 m? on a land plot of 6840 m?, capacity – 80 (160 tourists). |
Financial estimation of the project |
Total cost of the project, mln rubles |
223,2 |
Investment capacity, mln rubles |
223,2 |
Conditions of investor participation |
Investor’s Direct Investments |
Payback period |
6,6 |
Land characteristics |
Location |
Krasnodar region, Sochi, Lazarevsky district, Magnitogorskaya street |
Land plot area (m2) |
6840 |
Ground categories |
Settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
100 Kilowatt |
300 to TS-D24 |
Gas supply |
- |
- |
Water supply |
230 m2 |
0 m to water line D-700 mm, Magnitogorskaya street |
Sewerage system |
230 m2 |
Local treatment plants |
Telephone penetration |
- |
- |
Cost of maintenance of ground area with engineering infrastructure (million rubles) |
Water Supply – 28,4, Water Drainage – 28,4, Power Supply - 1,3, Total: 58,1 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Sochi Post Office |
20 |
Center of federal subject |
Krasnodar |
280 |
Highway (regional, federal significance) |
M27 |
0 |
Nearest railway station |
Sochi Station |
5 |
Airport |
Adler |
44 |
Seaport |
Sochi Seaport |
20 |