Project essence According to the project there will be built a hotel with 100 rooms and a balneary. The structure of the balneary will include a facility for diagnostics and treatment, a dietary cafeteria, a restaurant, a swimming pool with mineral water, a balneary, gyms and sports halls.
Project capacity Average annual occupancy - 65%; The first year of the object operation - 85%
Financial estimation of the project
Total cost of the project, mln rubles 300
Investment capacity, mln rubles 300
Conditions of investor participation Direct investments
Payback period 7.1 years
Land characteristics
Location Krasnodar Region, Belorechensky District, Velikovechnenskoye rural settlement, Velikovechnoye Village, near the well N5
Land plot area (m2) 17,000 sq. m
Ground categories Lands of municipalities
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply A high voltage line of 10kV; Reconstruction of the substation PS 35/10 kV “Velikoye” is re-quired 100
Gas supply High pressure gas pipeline - d=150 mm 300
Water supply None Drilling an artesian well is required
Sewerage system None Construction of small treatment facilities is needed
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Belorechensk City 30.16
Center of federal subject Krasnodar City 65
Highway (regional, federal significance) Maikop -- Ust-Labinsk -- Korenovsk 0.02
Roads of local significance None None
Nearest railway station Belorechenskaya station 33.01
Nearest railway lines Belorechenskaya station 33.01
Airport Krasnodar City 63
Seaport Novorossiysk City 199.8