Project essence |
According to the project there will be built a hotel with 100 rooms and a balneary. The structure of the balneary will include a facility for diagnostics and treatment, a dietary cafeteria, a restaurant, a swimming pool with mineral water, a balneary, gyms and sports halls. |
Project capacity |
Average annual occupancy - 65%; The first year of the object operation - 85% |
Financial estimation of the project |
Total cost of the project, mln rubles |
300 |
Investment capacity, mln rubles |
300 |
Conditions of investor participation |
Direct investments |
Payback period |
7.1 years |
Land characteristics |
Location |
Krasnodar Region, Belorechensky District, Velikovechnenskoye rural settlement, Velikovechnoye Village, near the well N5 |
Land plot area (m2) |
17,000 sq. m |
Ground categories |
Lands of municipalities |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
A high voltage line of 10kV; Reconstruction of the substation PS 35/10 kV “Velikoye” is re-quired |
100 |
Gas supply |
High pressure gas pipeline - d=150 mm |
300 |
Water supply |
None |
Drilling an artesian well is required |
Sewerage system |
None |
Construction of small treatment facilities is needed |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Belorechensk City |
30.16 |
Center of federal subject |
Krasnodar City |
65 |
Highway (regional, federal significance) |
Maikop -- Ust-Labinsk -- Korenovsk |
0.02 |
Roads of local significance |
None |
None |
Nearest railway station |
Belorechenskaya station |
33.01 |
Nearest railway lines |
Belorechenskaya station |
33.01 |
Airport |
Krasnodar City |
63 |
Seaport |
Novorossiysk City |
199.8 |