Project name |
Construction of tourist-ethnographic complex "Cossack village" |
Location of the project |
Abinskiy district |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
The project involves the creation of ethnographic settlement on Cossack life, this project will show the Cossack way of life |
Project capacity |
275 867 thousand rubles. |
Financial estimation of the project |
Total cost of the project, mln rubles |
26,07 |
Investment capacity, mln rubles |
26,07 |
Conditions of investor participation |
Direct investments, extra means |
Payback period |
4,9 years |
Land characteristics |
Location |
Southern suburb of mountains. Abinskà |
Land plot area (m2) |
10000 |
Ground categories |
land settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
from passing near the site of power lines |
500 |
Gas supply |
high pressure gas pipeline |
1000 |
Water supply |
no |
installation of a water tower |
Sewerage system |
no |
local treatment facilities construction septic tanks |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
city Abinsk |
- |
Center of federal subject |
city Krasnodar |
100 |
Highway (regional, federal significance) |
The highway Krasnodar - Novorossisk |
2 |
Roads of local significance |
Aren’t present |
1 |
Nearest railway station |
Abinsk, linear |
15 |
Nearest railway lines |
Krasnodar-Novorossisk |
15 |
Airport |
Krasnodar, Anapa |
120, 80 |
Seaport |
Novorossisk, Temryuk |
70, 100 |