Project name |
Base of the rest |
Location of the project |
Slavianskiy district |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
Rest will be the objects of accommodation (hotel-type houses) in terms of catering, bath complex, bridges, the organization of fishing |
Project capacity |
Projected percentage of sales: in the Krasnodar Territory - 60%, in Russia - 40%. |
Financial estimation of the project |
Total cost of the project, mln rubles |
81 mln. rbl |
Investment capacity, mln rubles |
81 mln. rbl |
Conditions of investor participation |
Direct investments, loan funds, other |
Payback period |
5,4 Years |
Land characteristics |
Location |
Krasnodar region, Slavic Village, District Achuevo from River estuary. The Reach to fish Lovetsky camp ¹ 2 JSC "Karl Marx" |
Land plot area (m2) |
8 500 m2 |
Ground categories |
Earth settlements. |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
- Construction of substations 10 / 0,4 kV - Build a section Viele -10 kV from Vl-10 MT-5 to my design-CPT - Reconstruction of Vl-10 FH-5 from the support ¹ 267 |
|
Gas supply |
The existing overhead high pressure gas pipeline from EMG with. village Achuevo D-100 mm |
|
Water supply |
- Construction of artesian wells (debit 30 m3 / h) - Construction of water tower "Rozhnovska» V = 50m3, h = 25m |
|
Sewerage system |
- Construction of modular block sewage treatment facilities performance Yes 15 m3/day - Construction of the reservoir for pumping industrial water into the canal irrigation system |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Slavyansk-on-Kuban |
80 |
Center of federal subject |
Krasnodar |
160 |
Nearest railway station |
railway station "Protoka" Slavyansk-on-Kuban |
85 |
Airport |
Anapa |
167 |
Seaport |
Temruk |
150 |