Base of the rest

Project name Base of the rest
Location of the project Slavianskiy district
Industry classification Resorts and tourism
Basic information about the project
Project essence Rest will be the objects of accommodation (hotel-type houses) in terms of catering, bath complex, bridges, the organization of fishing
Project capacity Projected percentage of sales: in the Krasnodar Territory - 60%, in Russia - 40%.
Financial estimation of the project
Total cost of the project, mln rubles 81 mln. rbl
Investment capacity, mln rubles 81 mln. rbl
Conditions of investor participation Direct investments, loan funds, other
Payback period 5,4 Years
Land characteristics
Location Krasnodar region, Slavic Village, District Achuevo from River estuary. The Reach to fish Lovetsky camp ¹ 2 JSC "Karl Marx"
Land plot area (m2) 8 500 m2
Ground categories Earth settlements.
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply - Construction of substations 10 / 0,4 kV - Build a section Viele -10 kV from Vl-10 MT-5 to my design-CPT - Reconstruction of Vl-10 FH-5 from the support ¹ 267
Gas supply The existing overhead high pressure gas pipeline from EMG with. village Achuevo D-100 mm
Water supply - Construction of artesian wells (debit 30 m3 / h) - Construction of water tower "Rozhnovska» V = 50m3, h = 25m
Sewerage system - Construction of modular block sewage treatment facilities performance Yes 15 m3/day - Construction of the reservoir for pumping industrial water into the canal irrigation system
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Slavyansk-on-Kuban 80
Center of federal subject Krasnodar 160
Nearest railway station railway station "Protoka" Slavyansk-on-Kuban 85
Airport Anapa 167
Seaport Temruk 150