Building of a health-improving centre

Project name Building of a health-improving centre
Location of the project Severskiy district
Industry classification Resorts and tourism
Basic information about the project
Project essence – Restoration of unique sources of mineral waters. – Repair of existing capacities (chink restoration, replacement and core and auxiliaries repair and communications) – Building in territory of a balneal complex of modern hotel on 100 numbers, arrangement of a modern service infrastructure, the polyclinic case on 1000 visitings in day, the medical-diagnostic centre on 550 visitings in day,water mud baths, a dining room of a dietary food, pool with mineral water, the medical-cosmetology centre, sports and training halls, restaurant.
Financial estimation of the project
Total cost of the project, mln rubles 115 mln. rbl
Investment capacity, mln rubles 115 mln. rbl
Conditions of investor participation Direct investments
Payback period 5 years
Land characteristics
Location 10, Gogolya st, Chernomorskiy settlement of Severskiy district Severskiy district, Krasnodarskiy region
Land plot area (m2) 7000
Ground categories Ground of settlement
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply power- 400 kVt; 10
Gas supply pipeline d100 mm., power- 300 ì3 per hour; 0,25 êÏà 10
Water supply d of pipe line is 100 m., consumption -70 ì3per day,powerful of network- 4200 cub.m. per day 10
Sewerage system power-6000ì.3per day,d-pipe line 400 from workingKNS, ? ,consumption -70 cub.m. ; 10
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Severskaya town 18
Center of federal subject Krasnodar city 55
Highway (regional, federal significance) Federal auto road Êrasnodar-Novorossiysk 1
Roads of local significance 0,01
Nearest railway station Hable station 4
Nearest railway lines 3
Airport 62
Seaport 90