Construction of the hotel-entertaining complex with the sports center

Project name Construction of the hotel-entertaining complex with the sports center
Location of the project Yeisk district
Industry classification Resorts and tourism
Basic information about the project
Project essence The investment project assumes construction of a hotel and entertaining complex with the sports centre in Yeisk district of Krasnodar territory on 20 rooms with an entertaining complex, a sports hall for yoga and fitness exercises, an exercise room.
Project capacity Annual: Hotel services – 4 860 room/day Public catering (average cheque) – 32 130 pcs. Sport services – 22 680 exercises Exercise room – 4 032 hours Billiards (average cheque) - 13 140 pcs.
Financial estimation of the project
Total cost of the project, mln rubles 29 mln. rub.
Investment capacity, mln rubles 29 mln. rub.
Conditions of investor participation Direct investments
Payback period 4,6 years
Land characteristics
Location Russia, Krasnodar territory, Yeisk, Shmidt St., between Pavlov St. and Gogolya St., on a coastal slope.
Land plot area (m2) 5 161
Ground categories Settlements land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply P/S 110/35/6 «Yeisk-2» Kv, 100 Kvt 115
Gas supply 6/0 kg/sm in a day, O150 mm 200
Water supply 10 cub. m. in a day O200 198
Sewerage system 10 cub. m. in a day O500 198
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center City Yeisk 2,7
Center of federal subject city Krasnodar 240
Highway (regional, federal significance) City Yeisk Kommunisticheskaya St 4
Roads of local significance City Yeisk, Shmidt St. 0,15
Nearest railway station City Yeisk, railway station 3
Nearest railway lines City Yeisk, Shmidt St. 0,15
Airport City Yeisk 3,5
Seaport City Yeisk 4