Project name |
Construction of a tourist complex"Caucasus" in Shedok rural settlement. |
Location of the project |
Mostovskoy district |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
Construction of the hotel case (with an opportunity of residing up to 200 person), with an opportunity of acceptance of tourists at any time year, small houses for rest (20 small houses for accommodation in them on 3-4 persons), a dining room on 100 places is supposed; a boiler-house, shower cubicle, pool, a bath, sports and playgrounds, water entertaining attractions, a park zone, arrangement of quay of the river Laba. |
Project capacity |
82 246 thousand rbl. |
Financial estimation of the project |
Total cost of the project, mln rubles |
150,3 million ruble |
Investment capacity, mln rubles |
150,3 million ruble |
Conditions of investor participation |
Direct investments |
Payback period |
4,7 years |
Land characteristics |
Location |
Krasnodar territory, area Mostovsky, Shedok rural settlement, 1500 m To the east õ. Kuibyshev. |
Land plot area (m2) |
100 000 |
Ground categories |
The grounds of agricultural purpose |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
- |
|
Gas supply |
d=57-76 mm; |
1000 |
Water supply |
- |
|
Sewerage system |
- |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Mostovskoj town |
20 km. |
Center of federal subject |
Krasnodar city |
270 km |
Highway (regional, federal significance) |
Labinsk city - Mostovskoj town – Border of Karachaevo Circassian republic |
5 km |
Roads of local significance |
Mostovskoj - Psebaj |
5 km |
Nearest railway station |
Shedok |
6 km |
Nearest railway lines |
Shedok |
6 km |
Airport |
Krasnodar city |
270 km |
Seaport |
Tuapse city |
270 km |