Spa buildings blocked type Za Rodinu

Project name Spa buildings blocked type Za Rodinu
Location of the project Temrukskiy district
Industry classification Resorts and tourism
Basic information about the project
Project essence Estate will be represented primarily by individual cottages, height not more than 3 floors The undoubted advantage of such suburban real estate type is the availability of adjoined land plot
Project capacity 2446m2
Financial estimation of the project
Total cost of the project, mln rubles 29.9 million rubles
Investment capacity, mln rubles 29.9 million rubles
Conditions of investor participation Direct investments
Payback period 3.25 years
Land characteristics
Location Krasnodar region, Temryuk District, settlement Za Rodinu
Land plot area (m2) 13317 m2
Ground categories Agricultural lands
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply To install transformer 25Mva, to reconstruct OPU-110 and 35 kV. To construct SS10/0.4 kV, to construct separate VL-10 kV line to set. Za Rodiny 1500
Gas supply High pressure u/g pipeline D=200 mm between settlements from Control set. Yubilejnyi 9200
Water supply To reconstruct main pressure line B-3 from Control Yanovskogo h. up to PK 39+74 2500
Sewerage system To project wastewater treatment facilities and stormwater network
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Temryuk town 25
Center of federal subject Krasnodar city 165
Highway (regional, federal significance) \"Novorossiysk – Kerch Channel \" motorway 6.5
Roads of local significance “Temryuk – Fontalovskaya” motorway 0.65
Nearest railway station Railway junction Slavyansk-na-Kubani 87.6
Nearest railway lines Railway “Vyshesteblievskaya –port Kavkaz” 6.5
Airport Anapa 75.6
Seaport 1) Port Temryuk; 2) Port Kavkaz 1) 50.6; 2) 35