Construction of sports and fitness complex

Project name Construction of sports and fitness complex
Location of the project Kurganinskiy district
Industry classification Resorts and tourism
Basic information about the project
Project essence Construction includes putting into operation of new building in 2 levels, provision of technical and consultative base for intensive, high intensive, power sports, rendering of health-improving procedures of massage parlour, food and beverage stores, specialized stores for other products
Project capacity Attendance of gym is 30 people a day, attendance of individual training is 5 people a day, group quantity (8 people) is 3, attendance of massage parlour is 4 people a day, amount of tying products sale is 2000 rubles a year
Financial estimation of the project
Total cost of the project, mln rubles 6,4 mln.rub
Investment capacity, mln rubles 6,4 mln.rub
Conditions of investor participation Direct investments
Payback period 4,2 years
Land characteristics
Location Krasnodar region, town Kurganinsk, Krupskoy Street,220A
Land plot area (m2) 510 sq.m.
Ground categories residential places ground
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply draw-off point TP-88 K-8 PS “Kurgannaya” 30
Gas supply From the operating underground high pressure gas pipeline on the R.Lucsemburg street, diameter is 200 mm 300
Water supply Water supply system on the R.Lucsemburg street 230
Sewerage system Sewerage system on the R.Lucsemburg street 230
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Kurganinsk town 0
Center of federal subject Krasnodar city 171,3
Highway (regional, federal significance) Ust-Labinsk-Labinsk-Upornaya 0,6
Roads of local significance Krupskoy street 0,02
Nearest railway station Kurgannaya station 1,2
Nearest railway lines Armavir-Tuapse 1,0
Airport Krasnodar city 174,3
Seaport Tuapse city 350,0