Project name |
Building of base of rest on 40 places |
Location of the project |
Gulkevichskiy district |
Industry classification |
Resorts and tourism |
Basic information about the project |
Project essence |
Building of base of rest for all family in a village Skobelevsky Gulkevichsky area with granting of services of time residing and fishery |
Project capacity |
Total area of 2,8 hectares, campings on 40 places |
Financial estimation of the project |
Total cost of the project, mln rubles |
9.9 |
Investment capacity, mln rubles |
9.9 |
Conditions of investor participation |
Direct investments |
Payback period |
3.9 yers |
Land characteristics |
Location |
Krasnodar region,Gulkevichi district, village Skobelevskaya |
Land plot area (m2) |
28 000 Sq. m |
Ground categories |
the earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
High-voltage electric line 10 kW |
|
Gas supply |
It is not required |
- |
Water supply |
D 100 mm |
850 m |
Sewerage system |
The septic |
It is located in ground area territory |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Gulkevichi city |
46 |
Center of federal subject |
Krasnodar city |
211 |
Highway (regional, federal significance) |
Ì29 Rostow-Mahachkala |
28 |
Roads of local significance |
Gulkevichi-Kropotkin |
0.02 |
Nearest railway station |
station Gulkevichi |
46 |
Nearest railway lines |
station Gulkevichi |
40 |
Airport |
Krasnodar city |
211 |
Seaport |
Novorossisk city |
360 |