Project name |
The organisation of production of tubercular linings (packing under egg) |
Location of the project |
Labinskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
The investment project represents the organisation of production of tubercular linings (packing under egg) in Labinsk area |
Project capacity |
15 tons a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
3,5 million rbl |
Investment capacity, mln rubles |
3,5 million rbl |
Conditions of investor participation |
Direct investments |
Payback period |
4,3 years |
Land characteristics |
Location |
Labinsk, street Zaslonova, 40 (area ABZ) |
Land plot area (m2) |
1000 m2 |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 0,4 kw |
100 |
Gas supply |
- |
- |
Water supply |
Projected tubular well |
In borders of a considered plot |
Sewerage system |
Sewer collector |
5 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Labinsk city |
- |
Center of federal subject |
Krasnodar city |
200 |
Highway (regional, federal significance) |
Krasnodar - Ahmetovsky |
1,2 |
Roads of local significance |
Urban roads with asphalt and gravel a cover |
0,05 |
Nearest railway station |
Station Labinsk |
4 |
Nearest railway lines |
|
2 |
Airport |
Krasnodar city |
200 |
Seaport |
Tuapse city |
180 |