Project name |
The organisation a tree of processing production |
Location of the project |
Labinskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
Organisation a tree of processing production for the purpose of satisfaction of requirements of inhabitants and the organisations Labinsk and areas adjoining to it in products from whole wood and furniture under individual orders |
Project capacity |
600 cubic m. a year |
Financial estimation of the project |
Total cost of the project, mln rubles |
6,5 million rbl |
Investment capacity, mln rubles |
6,5 million rbl |
Conditions of investor participation |
Direct investments |
Payback period |
4,6 years |
Land characteristics |
Location |
Labinsk, a southern industrial zone |
Land plot area (m2) |
2100,0 m2 |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 0,4 kw |
100 |
Gas supply |
- |
- |
Water supply |
110 mm |
100 |
Sewerage system |
City collector |
300 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Labinsk city |
16 |
Center of federal subject |
Krasnodar city |
216 |
Highway (regional, federal significance) |
Krasnodar - Ahmetovsky |
3 |
Roads of local significance |
Urban roads with asphalt and gravel a cover |
0,05 |
Nearest railway station |
Station Labinsk |
21 |
Nearest railway lines |
|
3 |
Airport |
Krasnodar city |
216 |
Seaport |
Tuapse city |
196 |