Project name |
Construction of the factory on production baby footwear in Leningradskaya village |
Location of the project |
Leningradskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
It Is Expected production five main groups baby foot-wear: sandals, loafers, oxford shoe, shoe, boots. |
Project capacity |
300 thous. conditional vapour (pair) per annum |
Financial estimation of the project |
Total cost of the project, mln rubles |
180,0 mln. rub. |
Investment capacity, mln rubles |
180,0 mln. rub. |
Conditions of investor participation |
Direct investments - 100% facility of the investor |
Payback period |
3 years 8 monats |
Land characteristics |
Location |
Krasnodar region, Leningradskaya village, northwest part |
Land plot area (m2) |
10 200 m2 |
Ground categories |
Lands of the agricultural purpose |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-10KV |
17,0 |
Gas supply |
Gasmain of the aver-age pressure O -219mm |
51,0 |
Water supply |
Asbestocementnaya pipe O-150mm |
9,5 |
Sewerage system |
|
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Leningradskaya village |
in border Leningradskaya vil-lage |
Center of federal subject |
Krasnodar city |
187,0 |
Highway (regional, federal significance) |
marginal importance |
0,085 |
Roads of local significance |
|
0,02 |
Nearest railway station |
Kanevskaya village |
38,0 |
Nearest railway lines |
Leningradskaya village |
0,350 |
Airport |
ROSTOV-on-Don |
123,0 |
Seaport |
Eysk |
106,0 |