Project name |
Building a plant on the production of artificial stone |
Location of the project |
Kanevskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
It is supposed that a prevailing kind of let out production will be the ceramic tile, also such kinds of production are included in assortment structure, as: a tile from an artificial stone, composit products, decorative products from an artificial stone. |
Project capacity |
Sales volume of 35 thousand square meters of products per year |
Financial estimation of the project |
Total cost of the project, mln rubles |
27,591 million rubles |
Investment capacity, mln rubles |
27,591 million rubles |
Conditions of investor participation |
Direct investments |
Basic indicators of investment project economic efficiency |
Simple payback time |
5,5 years |
Land characteristics |
Location |
Krasnodar territory, Kanevsky area, the item Kanevskaya, street of Western |
Land plot area (m2) |
8000 sq.m. |
Ground categories |
Lands of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
P/S 35/10 kV on street of Kalinina VL-10 kV KI-1 |
70 |
Gas supply |
Existing gas pipeline of a high pressure on street Western with installation SHRP |
50 |
Water supply |
Existing waterpipe on street Western |
50 |
Sewerage system |
Small treatment facilities in site territory |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The item Kanevsky |
- |
Center of federal subject |
The city of Krasnodar |
120 |
Highway (regional, federal significance) |
«Krasnodar-Yeysk» |
5 |
Roads of local significance |
Kanevskaya-Pridorochznaya |
0,05 |
Nearest railway station |
The item Kanevsky |
1 |
Nearest railway lines |
The item Kanevsky |
0,05 |
Airport |
The city of Krasnodar |
135 |
Seaport |
The city of Yeysk |
120 |