Construction of the plant for the production of finished steel

Project name Construction of the plant for the production of finished steel
Location of the project Abinskiy district
Industry classification Industry
Basic information about the project
Project essence The project involves the creation of modern production of high quality steel structures a wide range of
Project capacity 45 000 cubic metre a year
Financial estimation of the project
Total cost of the project, mln rubles 180
Investment capacity, mln rubles 180
Conditions of investor participation Direct investments, extra means
Payback period 3,6 years
Land characteristics
Location Northern suburb of the item Ahtyrsky
Land plot area (m2) 14000
Ground categories The earths of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 35 kV power line 1500
Gas supply high pressure gas pipeline not required
Water supply Rural water supply 1500
Sewerage system no local treatment facilities construction septic tanks
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center The city of Abinsk 7
Center of federal subject The city of Krasnodar 80
Highway (regional, federal significance) Motorway Krasnodar - Novorossisk 4
Roads of local significance No Nearby
Nearest railway station The Abinsky, The linear 15, 5
Nearest railway lines Krasnodar-Novorossisk 3
Airport Krasnodar, Anapa 120, 80
Seaport Novorossisk, Temryuk 70, 100