Construction production base

Project name Construction production base
Location of the project Kavkazskiy district
Industry classification Industry
Basic information about the project
Project essence Construction production base on fabrication of the goods concrete
Project capacity concrete goods - 67,2 kub. m/god cement - 12,0 tn/year macadam - 3,5 tn/year sand - 7,2 tn/year
Financial estimation of the project
Total cost of the project, mln rubles 29,731
Investment capacity, mln rubles 29,731
Conditions of investor participation Direct investments
Payback period 3,6
Land characteristics
Location Caucasian region, Kropotkin, str. Gubernskaya, 8à
Land plot area (m2) 4445
Ground categories of the land of the populated points
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 30 êÂò 250 m from electric network str. Spasskoy
Gas supply Not planned -
Water supply Volume consumptions of water 2,0 m3/will merge Own bored by art.skvazhina
Sewerage system Site sewerage is absent Construction local decontaminating buildings
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center city Kropotkin On territory of the city
Center of federal subject Krasnodar city 150
Highway (regional, federal significance) FAD "Caucasus" àâòîäîðîãà marginal importance Stavropoli - Temryuk - Krasnodar. 0,7 1,6
Roads of local significance str Red Plowman - a road with asphalt covering road with asphalt covering
Nearest railway station Railway Station “Kavkazskaya 2,6
Nearest railway lines “Russian Railways” ÎÀÎ at the west of Kropotkin industrial area. 2,6
Airport city Krasnodar 150
Seaport city Novorossiysk 265