Metal-plastic pipes production in Tbilisskaya village

Project name Metal-plastic pipes production in Tbilisskaya village
Location of the project Tbilisskiy district
Industry classification Industry
Basic information about the project
Project essence Construction of modern factory on metal-plastic pipes production
Project capacity 6000 000 m.
Financial estimation of the project
Total cost of the project, mln rubles 350 mln.rbl.
Investment capacity, mln rubles 350 mln.rbl.
Conditions of investor participation Direct investments
Payback period 5 years
Land characteristics
Location 500 meters from the west part of Tbilisskaya village
Land plot area (m2) 10000 sq.m.
Ground categories settlements land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply from existing power station 110/35/10 kw 1000
Gas supply from existing gas pipe with low pressure 10
Water supply from existing water pipe d-150 mm., free pressure in net 1,5 atm. 550
Sewerage system local
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Tbilisskaya village
Center of federal subject Krasnodar city 97
Highway (regional, federal significance) Temryuk-Krasnodar-Kropotkin 1,9
Roads of local significance existing natural soil road 0,17
Nearest railway station Grechishkino station 2,4
Nearest railway lines Krasnodar-Kropotkin 0,13
Airport Krasnodar airport 90
Seaport Novorossiysk seaport 280