Construction of wood-working plant

Project name Construction of wood-working plant
Location of the project Kavkazskiy district
Industry classification Industry
Basic information about the project
Project essence Annual production volume - 64048 m3. Capacity utilization — 70 %.
Project capacity 185,4
Financial estimation of the project
Total cost of the project, mln rubles 185,4
Investment capacity, mln rubles 185,4
Conditions of investor participation Direct investments
Payback period 4,7
Land characteristics
Location 17 Promyshlennaya Street / Proyezd 4 Promyshlenny, 1, Kropotkin
Land plot area (m2) 39294,0
Ground categories Settlement lands
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Kropotkin Substation 330/-/6kV 220 MW 1600
Gas supply Kropotkin high pressure gas-distributing station 2800
Water supply Artesian boreholes No.46, No.47 2300 and 2400
Sewerage system Sewage collector 300 mm on Mashinostroitelnaya Street 400
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center city Kropotkin 6,0
Center of federal subject Krasnodar city 130
Highway (regional, federal significance) FAD "Caucasus" àâòîäîðîãà marginal importance Stavropoli - Temryuk - Krasnodar. 3,1 4,4
Roads of local significance str Red Plowman - a road with asphalt covering 0,06
Nearest railway station Railway Station “Kavkazskaya 5,8
Nearest railway lines “Russian Railways” ÎÀÎ at the west of Kropotkin industrial area. 1,9
Airport city Krasnodar 130
Seaport city Novorossiysk 265