Project name |
Construction of the workshop for manufacture metal-plastic windows and doors |
Location of the project |
Beloglinskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
Within the project realization manufacture windows and doors made of metal and plastic on progressive technology, non-polluting, not having analogy in the local regional market is planned |
Project capacity |
The project provides manufacturing windows and doors made of metal and plastic in number of 4000 units |
Financial estimation of the project |
Total cost of the project, mln rubles |
11 |
Investment capacity, mln rubles |
11 |
Conditions of investor participation |
Direct investments |
Payback period |
1-1,5 years |
Land characteristics |
Location |
Yuzhnaya Street, Belaya Glina village, Krasnodar region |
Land plot area (m2) |
4500 |
Ground categories |
Settlement lands |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
10 kV |
150 |
Gas supply |
GDS |
150 |
Water supply |
D=100 mm |
150 |
Sewerage system |
It is absent |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Belaya Glina village |
0 |
Center of federal subject |
Krasnodar city |
240 |
Highway (regional, federal significance) |
Tikhoretsk - Salsk |
2 |
Roads of local significance |
rural road |
0,02 |
Nearest railway station |
Beloglinskaya |
6 |
Nearest railway lines |
Single lane |
6 |
Airport |
Krasnodar city |
240 |
Seaport |
Novorossiysk city |
385 |