Construction plant of face brick and tile.

Project name Construction plant of face brick and tile.
Location of the project Krylovsky district
Industry classification Industry
Basic information about the project
Project essence Project is assumed construction plant of production high quality face brick and tile
Project purpose Creating of manufacture for meeting requirements of district population in owner industrial and construction material
Project capacity 20 mln. unit per year brick and 2,2 mln. unit tile
Consumer market description Potential consumer will population of municipality and enterprises of district, budget establishment (hospitals, kindergartens, schools and others), also population of another districts.
Object construction term 2 year
Competitive advantage Construction on district territory with modern technology, more higher quality characteristics goods in comparison with goods that create in district at present time.
Resource availability for project realization Resource : within the limits of project realization for high-grade financing plant is necessary provide according volume of clay sand and minerals (cost of raw material is 9.319 mln.RUR) Energy carrier: necessity system water supply, water drain,
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MW 7
Planned volume of gas consumption (annual), million cubic meters 0,011
Planned volume of water consumption (annual), million cubic meters 0,2
Degree of project development Created business plan, formed ground area, investor searching
Financial estimation of the project
Total cost of the project, mln rubles 106 mln. RUR
Own resources, million rubles 106 mln. RUR
Means of regional (municipal) budget, million rubles 0
Previously involved means, million rubles 0
Investment capacity, mln rubles 106 mln. RUR
Conditions of investor participation Direct investment
Form of investments return monetary
Payback period 3,3 year
Basic indicators of investment project economic efficiency
Net present value (NPV) 363,4 mln. RUR.
Simple payback time 3,3 year
Discounted payback period 3,4 year
Internal rate of return (IRR) 62 % annual
Productivity index (PI) 117 %
Income 163
Social efficiency of investment project
Number of workplaces 80
Salary average level 25 393
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles 12,81
which includes into consolidated budget of the krai, million rubles 4,823
Land characteristics
Location Location of brick plant is planned in Oktyabrskaya village, Industrialnaya st.
Cadastral number of quarter 23:14:05 01 003
Land plot area (m2) required area land lot is 30000 sqr.mt
Ground categories Lands of settlements
Kind of permitted use Construction of the plant for producing construction material is planned on ground area
Actual use pasturage
Availability of buildings, structures, constructions no
Authorizations, urban planning documentation General plan of Oktyabrskaya settlement approved and put into effect with reference to territory by decision Council Municipality Krylovskaya district Krasnodar region 27.06.2007 ¹405 and prepaered by OJSC “Institute of territorial development of Kra
Information on proprietor (franchisor) of ground area
Proprietor state ownership
Franchisor no
Right kind (future) rent
Data on encumbrances
Kind of encumbrances, restrictions No
Area of encumbrances No
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply 10 êWt until 200 ́
Gas supply diam. 200 mm until 400 ́
Water supply diam. 100 mm until 300 ́
Sewerage system local sewage disposal plant
Telephone penetration until 400 ́
Cost of maintenance of ground area with engineering infrastructure (million rubles) 7,3
Additional information on ground area
Special conditions Collapsing soil of the I type
Cost of rent/repayment of ground area (million rubles) 2,4 thrs.RUR./ 7,2 thrs.RUR.
Notes no
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Krylovskaya vill. 18
Center of federal subject Krasnodar city 160
Highway (regional, federal significance) M4 0,5
Roads of local significance Industrialnaya st 0,1
Nearest railway station Railway station Krylovskaya 3
Nearest railway lines Railway station Krylovskaya 0,7
Airport Rostov-on-Don 120
Seaport Eisk 150
Contact information
Information on project proponent no
Information on applicant Administration of municipality Krylovskaya district 352080, Krylovskaya village, Ordzhonikidze st. 43, tel. /fax(86161) 31-4-84/31-3-73 ; official web-site: www.krilovskaya.ucoz.ru, Ubiyko Sergey Ivanovich – Head of municipality Krylovskaya district,