Construction of the shop on processing tree

Project name Construction of the shop on processing tree
Location of the project Kavkazskiy district
Industry classification Industry
Basic information about the project
Project essence The Construction of the building, in which will be shop on processing tree with subdivisions, which are divided on the main and auxiliary. The Main subdivisions: " dry; " machine. Auxiliary: " stre-room; " storehouse and finished products;
Project capacity board - 3 168 kub. m. " board - 3 379 kub.m.
Financial estimation of the project
Total cost of the project, mln rubles 26,820
Investment capacity, mln rubles 26,820
Conditions of investor participation Direct investments
Payback period 4,7
Land characteristics
Location Temizhbekskoe rural settling, cl. Temizhbekskaya, str. Zavokzalinaya, 2/1
Land plot area (m2) 5000
Ground categories lands of the populated points
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply transformer substation 6/0,4 sq 10 m
Gas supply leading gasmain of the high pressure on cl. Temizhbekskuyu DU-300 3000 m
Water supply steel pluming by diameter 150 mms 290 m
Sewerage system local local building -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center city Kropotkin 15
Center of federal subject city Krasnodar 165
Highway (regional, federal significance) FAD "Caucasus" 20 5
Roads of local significance car road Temryuk-Krasnodar - Stavropoli 1
Nearest railway station KROPOTKIN-Temizhbekskaya 1,5
Nearest railway lines station "Temizhbekskaya" 1,5
Airport Krasnodar 155
Seaport Novorossiysk 315