Project name |
Construction of processing plant skin |
Location of the project |
Korenovskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
The project is proposed organization of production of leather processing capacity of 30 thousand of processed skins per year, production of which is the skin without finishing, leather for lining, leather of split leather. |
Project capacity |
30 thousand enterprises of processed skins per year |
Financial estimation of the project |
Total cost of the project, mln rubles |
13 |
Investment capacity, mln rubles |
13 |
Conditions of investor participation |
Direct investments |
Payback period |
2,9 years |
Land characteristics |
Location |
Krasnodar region, Korenovsky district Proletarskoye rural settlement, 0,5 km south of the village Babich Korenovskaya |
Land plot area (m2) |
20000 |
Ground categories |
Earth settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
PS 110/35/10 kV "Zhuravskaya, VL-10 kV RPCH7" from PS "life cycle" with the construction of Vl-0, 4 kV |
1500 |
Gas supply |
Steel underground high pressure gas pipeline D-219 mm, leading to the x. B. Korenovskaya |
2000 |
Water supply |
Sewage on the street. Soviet, the volume of water consumption - 7.0 m3 / day |
800 |
Sewerage system |
The device is small sewage treatment plants, wastewater volume 7.0 m3 / day |
The section |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Korenovsk City |
12 |
Center of federal subject |
Krasnodar City |
70 |
Highway (regional, federal significance) |
Ì4 Don |
1 |
Roads of local significance |
Sovetckaya street |
0,8 |
Nearest railway station |
Korenovsk Station |
9 |
Nearest railway lines |
|
4 |
Airport |
Airport Krasnodar |
81 |
Seaport |
Novorossisk |
268 |