Construction of a factory on processing PET of bottles in item Mostovskoy

Project name Construction of a factory on processing PET of bottles in item Mostovskoy
Location of the project Mostovskoy district
Industry classification Industry
Basic information about the project
Project essence Maintenance of need of Krasnodar territory and area Mostovskogo in PET products and improvement of ecological conditions.
Project capacity 3300 tons
Financial estimation of the project
Total cost of the project, mln rubles 23,69 million ruble
Investment capacity, mln rubles 23,69 million ruble
Conditions of investor participation Direct investments
Payback period 3,6 years
Land characteristics
Location Krasnodar territory, area Mostovsky, item Mostovskoy, southern industrial zone
Land plot area (m2) 5000,00
Ground categories The Earth of settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Electric line – 10 kw 120
Gas supply d=57-76 mm; 300
Water supply d=150 mm; 250
Sewerage system d=150 mm; 150
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Center of federal subject Krasnodar city 250 km
Highway (regional, federal significance) Labinsk city - Mostovskoj town – Border of Karachaevo Circassian republic 4 km
Roads of local significance 0,1
Nearest railway station Mostovskoj 4 km
Nearest railway lines Mostovskoj 4 km
Airport Krasnodar city 250 km
Seaport Tuapse city 250 km