Project name |
Construction of a mini-factory for modeling and sewing of uniforms, covers, and tarpaulins |
Location of the project |
Belorechenskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
Construction of a mini-factory for modeling and sewing of uniforms, covers (for car seats, for the car protection), tarpaulins for trucks. |
Project capacity |
The first production year – up to 4 168.5 thousand rubles, subsequent years of the planned period - 6 321 thousand rubles |
Financial estimation of the project |
Total cost of the project, mln rubles |
1.8 mln. rubles. |
Investment capacity, mln rubles |
1.8 mln. rubles. |
Conditions of investor participation |
direct investments. |
Payback period |
2.3 years. |
Land characteristics |
Location |
Krasnodar Region, Belorechensky District, Chernigovsky rural okrug, Molodezhny settlement. |
Land plot area (m2) |
12 000 sq.m. |
Ground categories |
lands of settlements. |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Substation PS 110/35/10 kilovolts “Ochistnie Sooruzhenia” (treatment facilities), |
within 150 m. |
Gas supply |
None |
|
Water supply |
unavailable |
projection of the new water supply sources is required. |
Sewerage system |
None |
construction of the treatment facilities is required. |
Telephone penetration |
None |
construction of lines and structures of communication is required. |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Belorechensk City |
28.89 km |
Center of federal subject |
Krasnodar City |
123.9 km |
Highway (regional, federal significance) |
|
1.66 km |
Roads of local significance |
|
0.5 km |
Nearest railway station |
Belorechenskaya |
1.2 km |
Nearest railway lines |
|
1.2 km |
Airport |
Krasnodar City |
121.9 km |
Seaport |
Novorossiysk City |
259 km |