Construction of a plant for processing of cull logs (pellets)

Project name Construction of a plant for processing of cull logs (pellets)
Location of the project Belorechenskiy district
Industry classification Industry
Basic information about the project
Project essence Construction of a plant on processing of cull logs into coal (with installation of additional production lines for the production of pellets). Production of fuel briquettes from cull longs is intended.
Project capacity 800 -1 000 tons of coal a year.
Financial estimation of the project
Total cost of the project, mln rubles 8.3 mln. rubles.
Investment capacity, mln rubles 8.3 mln. rubles.
Conditions of investor participation direct investments.
Payback period 2.2 years.
Land characteristics
Location Druzhnenskoye rural settlement, the site for storage of chemicals.
Land plot area (m2) 35 000 sq.m.
Ground categories lands of settlements.
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Substation PS 110/35/10 kilovolts “Ochistnie Sooruzhenia” (treatment facilities), 750 meters
Gas supply a high pressure gas pipeline - d=200 3 500 m
Water supply None drilling an artesian well is needed, depth - 250-400 m.
Sewerage system None it requires to design a compact plant of sewage treatment with a capacity of capacity of not less than 100 cubic meters/hour.
Telephone penetration None construction of lines and structures of communication is required.
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Belorechensk City 13.6 km
Center of federal subject Krasnodar City 108.6 km
Highway (regional, federal significance) 3.4 km
Roads of local significance 0.002 km
Nearest railway station Belorechenskaya 3.5 km
Nearest railway lines 0.5 km
Airport Krasnodar City 106.6 km
Seaport Novorossiysk City 243.6 km