Project name |
Construction of a plant on production of the ventilated facades |
Location of the project |
Belorechenskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
Implementation of the investment project envisages meeting the existing demand and replacement of the imported suspended ventilated facades. |
Project capacity |
800 thousand sq. m of composite materials per year |
Financial estimation of the project |
Total cost of the project, mln rubles |
140 million rubles |
Investment capacity, mln rubles |
140 million rubles |
Conditions of investor participation |
Direct investments |
Payback period |
2.2 years |
Land characteristics |
Location |
Krasnodar Region, Belorechensk City, Brigadnaya Street, w/n |
Land plot area (m2) |
31,180 sq. m |
Ground categories |
Lands of municipalities |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Substation PS 110/35/10 kV of “Ochistniye sooruzheniya” (treatment facilities) |
450 |
Gas supply |
High pressure gas pipeline - d=200 mm |
900 |
Water supply |
None |
Projection of the new water supply sources is required |
Sewerage system |
None |
Construction of the new treatment facilities is required |
Telephone penetration |
None |
Construction of lines and structures for communication are required |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Belorechensk City |
7.91 |
Center of federal subject |
Krasnodar City |
90.64 |
Highway (regional, federal significance) |
Maikop -- Ust-Labinsk -- Korenovsk 27 km + 600 m (on the left) |
0.27 |
Roads of local significance |
Brigadnaya Street |
0.05 |
Nearest railway station |
Belorechenskaya station |
6.6 |
Nearest railway lines |
Belorechenskaya station |
4.58 |
Airport |
Krasnodar City |
88.4 |
Seaport |
Novorossiysk City |
234.36 |