Factory building on processing of car tires

Project name Factory building on processing of car tires
Location of the project Severskiy district
Industry classification Industry
Basic information about the project
Project essence Factory building on non-polluting processing of the automobile tires which were in the use, and as waste rubber products capacity 70 tone/sut Primary product of processing waste rubber a waste - a rubber crumb of various fraction. An end-product of processing of such raw materials there will be coverings of athletic fields at schools, improving establishments, sports complexes and other territories. Such production allows to make a platform not only safe, but also beautiful, the covering can be laid on the most difficult relief and have any contours.
Project capacity 70 ton/day of rubber waster
Financial estimation of the project
Total cost of the project, mln rubles 32,3 mln.rbl
Investment capacity, mln rubles 32,3 mln.rbl
Conditions of investor participation Direct investments
Payback period 5,2 years
Land characteristics
Location Krasnodarskiy region Severskiy district, Kovalenko settlement (Afipskiy municipal union)
Land plot area (m2) 13 000
Ground categories The grounds of agricultural purpose
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply from installation 35\6 kW Present power 1796,09 kWt, necessary power – 100 kwt 25
Gas supply No 0
Water supply To do artesian boring hole 0
Sewerage system To observed local purification rcuipment 0
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Severskaya town 25
Center of federal subject Krasnodar city 27
Highway (regional, federal significance) Federal auto road Êrasnodar-Novorossiysk 6
Roads of local significance 0,05
Nearest railway station “Afipskaya” station 6
Nearest railway lines 6
Airport “Krassnodar” 34
Seaport “ Nonorossiysk” 135