Project name |
Confectionery factory |
Location of the project |
Pavlovskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
The project provides for the production of cakes and pastries, biscuits and waffles, muffins and rolls. |
Project capacity |
Cakes and Pastries - 25 tons in year; Biscuits and wafers - 180 tons in year; Muffins and rolls - 160 tons in year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
28,0 mill. rbl |
Investment capacity, mln rubles |
28,0 mill. rbl |
Conditions of investor participation |
Direct investmentsr |
Payback period |
2 years |
Land characteristics |
Location |
Krasnodar Region, village Pavlovsk, Eastern Industrial Zone |
Land plot area (m2) |
60 000 (m2) |
Ground categories |
The grounds of a settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
35 kV |
35 |
Gas supply |
The gas supply will be carried out with output networks SDG village Pavlovsk adherence to the existing gas pipeline medium pressure 0,63 MPa |
595 |
Water supply |
Construction of artesian wells |
within the boundaries of the land |
Sewerage system |
Construction of local treatment facilities |
within the boundaries of the land |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The Pavlovskaya |
2,0 |
Center of federal subject |
Krasnodar city |
140 |
Highway (regional, federal significance) |
road of federal "Don" |
1,125 |
Roads of local significance |
- |
- |
Nearest railway station |
Railway station «Sosyka – Eisk» |
4,4 |
Nearest railway lines |
Access tracks belonging |
0,535 |
Airport |
The Krasnodar |
145 |
Seaport |
The Eisk |
140 |