Project name |
Wood-processing complex |
Location of the project |
Pavlovskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
Creating a timber complex. The development of wooden housing. |
Project capacity |
The volume of processed wood in the year 30000 m3. The output in the kit at home to 120 sets per year. |
Financial estimation of the project |
Total cost of the project, mln rubles |
745 mill. rbl |
Investment capacity, mln rubles |
745 mill. rbl |
Conditions of investor participation |
Direct investmentsr |
Payback period |
2 years |
Land characteristics |
Location |
Krasnodar region, Pavlovsky District, village Pavlovsk, Eastern Industrial Zone |
Land plot area (m2) |
15 000 (m2) |
Ground categories |
The grounds of a settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Provision of PS 35/10 KW "Komsomolets", from VL-10 kV K-5 and to design and implement the construction of TA 10 / 0,4 kV. |
230 |
Gas supply |
Technical feasibility of gas supply available. The gas supply will be carried out with the output networks SDG Art. Pavlov's accession to-eat to the existing gas-wire high-pressure 0,6 MPa. |
130 |
Water supply |
Need to build artesian well |
within the boundaries of the land |
Sewerage system |
Construction of local treatment facilities |
within the boundaries of the land |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The Pavlovskaya |
- |
Center of federal subject |
Krasnodar city |
120 |
Highway (regional, federal significance) |
federal roads "Don" |
0,065 |
Roads of local significance |
- |
0,025 |
Nearest railway station |
Railway station «Sosyka – Eisk», Railway station«Sosyka –Rostov» |
22, 23,5 |
Nearest railway lines |
- |
- |
Airport |
The Krasnodar |
108,5 |
Seaport |
The Eisk |
144,5 |