Wood-processing complex

Project name Wood-processing complex
Location of the project Pavlovskiy district
Industry classification Industry
Basic information about the project
Project essence Creating a timber complex. The development of wooden housing.
Project capacity The volume of processed wood in the year 30000 m3. The output in the kit at home to 120 sets per year.
Financial estimation of the project
Total cost of the project, mln rubles 745 mill. rbl
Investment capacity, mln rubles 745 mill. rbl
Conditions of investor participation Direct investmentsr
Payback period 2 years
Land characteristics
Location Krasnodar region, Pavlovsky District, village Pavlovsk, Eastern Industrial Zone
Land plot area (m2) 15 000 (m2)
Ground categories The grounds of a settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Provision of PS 35/10 KW "Komsomolets", from VL-10 kV K-5 and to design and implement the construction of TA 10 / 0,4 kV. 230
Gas supply Technical feasibility of gas supply available. The gas supply will be carried out with the output networks SDG Art. Pavlov's accession to-eat to the existing gas-wire high-pressure 0,6 MPa. 130
Water supply Need to build artesian well within the boundaries of the land
Sewerage system Construction of local treatment facilities within the boundaries of the land
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center The Pavlovskaya -
Center of federal subject Krasnodar city 120
Highway (regional, federal significance) federal roads "Don" 0,065
Roads of local significance - 0,025
Nearest railway station Railway station «Sosyka – Eisk», Railway station«Sosyka –Rostov» 22, 23,5
Nearest railway lines - -
Airport The Krasnodar 108,5
Seaport The Eisk 144,5