Project name |
Construction of Industrial Technology Park "Tikhoretsky" for small and medium business |
Location of the project |
Tihoretskiy district |
Industry classification |
Industry |
Basic information about the project |
Project essence |
The investment project envisages the construction of industrial Technopark "Tikhoretsky" for small and medium businesses. The main tasks of the industrial technology park "Tikhoretsky" for small and medium-sized businesses are forming in the region, market-oriented scientific and industrial infrastructure, the integration of the scientific and industrial and educational complex of Krasnodar region |
Project capacity |
SERVICES/ Volume delivery: Rental of offices, warehouses, etc. – 24000 m2; Audit, accounting services – 500 Services; Rental of retail and entertainment areas – 7500 m2; Rental of exhibition space – 6000 m2; Advertising Services – 300 Services; Business plans – 256 pcs; Printing – 5700 Services |
Financial estimation of the project |
Total cost of the project, mln rubles |
480,0 million rubles |
Investment capacity, mln rubles |
480,0 million rubles |
Conditions of investor participation |
Direct investment in 100% of |
Payback period |
5,3 years |
Land characteristics |
Location |
Krasnodar region, Tikhoretsky district, north - western part of the city Tikhoretsk Village. Stone in the former "fur farms" Tikhoretskaya |
Land plot area (m2) |
205000 sq |
Ground categories |
Earth settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
facility to provide from the new PS 35/10 "Stroyzavod" performed by the scheme of the model project 35-9 with installation of two power transformers, power of a power transformer shall conform to the power of the object. Projected unit RE and A agree with the actions necessary to provide for their replacement and reconstruction. Perform installation of VL-35 kV from 110 kV "Meat" to PS 35/10 KW "Stroyzavod and 35 kV from 35 kV overhead lines," Meat - Novorozhdestvenskaya "to PS 35 kV" Stroyzavod. At 110 kV "Meat" to provide for the replacement of power transformers, power transformers to determine on the size of the object. Perform Construction of the linear cell 35 kV, to fulfill the construction of two spans of two VL-10 kV from different sections of the tire 10 kV substation "park" in strontium object |
360 |
Gas supply |
need strip looping medium pressure d 400 mm length 6,7 km from the street. Gritsanova in Tikhoretsk to n. A stone, with adjustments to the General Scheme of gas supply |
1300 |
Water supply |
technical possibility of technological connection of utilities available in the nearest water pipe D 100 mm |
100 |
Sewerage system |
technical possibility of technological connection to sewer D 200 mm located on the territory of the former "fur farms" |
100 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
City Tikhoretsk |
6,1 |
Center of federal subject |
City Krasnodar |
158 |
Highway (regional, federal significance) |
FAD "Caucasus" Roads of regional significance "Zhuravskaya - Tikhoretsk" |
7,3 0,30 |
Roads of local significance |
pos. Stone |
0,30 |
Nearest railway station |
Station Tikhoretskaya |
6,7 |
Nearest railway lines |
Station Tikhoretskaya |
6,7 |
Airport |
City Krasnodar |
158 |
Seaport |
Yeisk |
209 |