Construction shop rolling

Project name Construction shop rolling
Location of the project Tihoretskiy district
Industry classification Industry
Basic information about the project
Project essence Construction shop rolling
Financial estimation of the project
Total cost of the project, mln rubles 120,0 million rubles
Investment capacity, mln rubles 120,0 million rubles
Conditions of investor participation Direct investment in 100% of
Form of investments return 6,1 Year
Land characteristics
Location Krasnodar Region, city Tihoretsk, in the "Plant" red hammer "
Land plot area (m2) 10000 sq
Ground categories Earth settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Former "Mechanical plant's production pro-yes it is possible to connect to the con-stroke connect wires to the wires branch TP-83p on the anvil ¹ 3 / 10 VL-6 kV feeder" U-11 "from the PS-35 kV" South ", as well as the second board (back) contact connections at times lived CL 6kV join "J-2" from the PS-35 / 6 kV "South" in RU-6kV TA-33. Passing ability of feeder PS-35/6kV "South" is 500 kW. 250
Gas supply Connecting point D pipeline 114 mm in the intersection of ul. Menshikov and st. Achkasova, pressure 0,25 MPa. 4000
Water supply The point of joining pipe network on the territory of "Factory" Red Hammer »D 150 mm. 200
Sewerage system The point of joining the sewer network in the "Factory" Red Hammer »D 150 mm 200
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center City Tikhoretsk 1,5
Center of federal subject Krasnodar ñity 164
Highway (regional, federal significance) FAD "Caucasus" 2,3
Roads of local significance City Tikhoretsk 0,1
Nearest railway station Station Tikhoretskaya 0,5
Nearest railway lines Station Tikhoretskaya 0,5
Airport Krasnodar 164