Project name |
Cultivation of a horned cattle of 1500 goals |
Location of the project |
Apsheronskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Saturation of a commodity market by high-quality production |
Project capacity |
8400 t milk, 350 t meat |
Financial estimation of the project |
Total cost of the project, mln rubles |
110,0 |
Investment capacity, mln rubles |
110,0 |
Conditions of investor participation |
Direct investments |
Payback period |
5 |
Land characteristics |
Location |
In a northeast direction from village Chernigov |
Land plot area (m2) |
79000 |
Ground categories |
The earths of a stock |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
Electric mains-10 ê the item/item ê \"Chernigov\" |
|
Gas supply |
No, it is planned from the projected gas pipeline which is passing on a platform |
|
Water supply |
From existing networks |
50 |
Sewerage system |
Independent, building of local system of clearing is necessary |
|
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Apsheronsk |
29 |
Center of federal subject |
Krasnodar |
139 |
Highway (regional, federal significance) |
Highway Maikop-Tuapse |
22 |
Roads of local significance |
Apsheronsk-Chernigov |
0, 04 |
Nearest railway station |
The item Chernigov (narrow-gauge) |
2 |
Nearest railway lines |
|
50 |
Airport |
Krasnodar |
139 |
Seaport |
Tuapse |
127 |