Location of a hothouse complex

Project name Location of a hothouse complex
Location of the project Krasnoarmejskiy district
Industry classification Agriculture
Basic information about the project
Project essence Construction of casing complex for growing vegetables. The attraction of investment funds to implement the project to create a hothouse complex
Project capacity The first year after the completion of the construction plan grown the 475 th. kg, revenue will be 29.47 million. rub; second year 570 000. kg and 38.6 million. roubles respectively, third year 730 000. kg and 51.74 million. roubles respectively.
Financial estimation of the project
Total cost of the project, mln rubles 30 mln. rub.
Investment capacity, mln rubles 30 mln. rub.
Conditions of investor participation Direct investments
Payback period 3,2 years
Land characteristics
Location Starodjerelievskaya village, str. Limannaya, 2
Land plot area (m2) 3 0288 sq.m.
Ground categories Land settlements
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply Power – 100 kV 20
Gas supply Power – 130 mm O 100 mm. O159 mm 200
Water supply O 150 mm existing street water supply networks – 50m. Well point drilling with output not more than 25 m? per hour;
Sewerage system - Doesn’t exist
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Poltavskaya village 12
Center of federal subject Krasnodar 100
Highway (regional, federal significance) Krimsk – Slavyansk-on-Kuban - Tymashevsk 0.4
Roads of local significance Limannaya street 0.01
Nearest railway station Poltavskaya station 12
Nearest railway lines Poltavskaya station 12
Airport Krasnodar 120
Seaport Novorossiysk 130