Project name |
The organisation of production of mixed fodders |
Location of the project |
Labinskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
The given investment project means the organisation of production mixed fodder of production for the purpose of satisfaction of requirements of personal part-time farms, krestjansko-farms Labinsk and areas adjoining to it. |
Project capacity |
6 tons a year; |
Financial estimation of the project |
Total cost of the project, mln rubles |
6,0 million rbl |
Investment capacity, mln rubles |
6,0 million rbl |
Conditions of investor participation |
Direct investments |
Payback period |
2,5 years |
Land characteristics |
Location |
Labinsk area, the item Brave, street October |
Land plot area (m2) |
2000,0 m2 |
Ground categories |
The earths of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 0,4 kw |
15 |
Gas supply |
63 mm |
40 |
Water supply |
100 mm |
300 |
Sewerage system |
200 mm |
35 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Labinsk city |
55 |
Center of federal subject |
Krasnodar city |
255 |
Highway (regional, federal significance) |
Krasnodar - Ahmetovsky |
10 |
Roads of local significance |
Urban roads with asphalt and gravel a cover |
0,2 |
Nearest railway station |
Station Labinsk |
35 |
Nearest railway lines |
|
30 |
Airport |
Krasnodar city |
255 |
Seaport |
Tuapse city |
235 |