Construction of a grain processing complex

Project name Construction of a grain processing complex
Location of the project Kalininskiy district
Industry classification Agriculture
Basic information about the project
Project essence The project provides construction of a modern grain processing complex including grain cleaning complex and grain processing workshop with capacity 30 thousand tons per year.
Project capacity Annual production 30 000 thousand tons.
Financial estimation of the project
Total cost of the project, mln rubles 300,0 mln. Rub.
Investment capacity, mln rubles 300,0 mln. Rub.
Conditions of investor participation Direct investments, loan funds, other
Payback period 4,7 years
Land characteristics
Location Sportivnaya street, stanitsa Grivenskaya, Kalininskiy district
Land plot area (m2) 35000 square meters
Ground categories Agricultural assignment land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply From substation 110 kV “Grivenskaya”, overhead power line – 10, Package transformer substation 10/04 kV 150
Gas supply From 325 mm pipe, pressure 3 atm 100
Water supply From 110 mm pipe 110
Sewerage system Projected septic -
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Stanitsa Kalininskaya 42
Center of federal subject Krasnodar 107
Highway (regional, federal significance) Stanitsa Kalininskaya – stanitsa Grivenskaya 0,05
Roads of local significance Furmanova street 1
Nearest railway station Station “Velichkovka” 47
Nearest railway lines Station “Velichkovka” 47
Airport Krasnodar 122
Seaport Novorossiysk 187