Project name |
Construction of a grain processing complex |
Location of the project |
Kalininskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
The project provides construction of a modern grain processing complex including grain cleaning complex and grain processing workshop with capacity 30 thousand tons per year. |
Project capacity |
Annual production 30 000 thousand tons. |
Financial estimation of the project |
Total cost of the project, mln rubles |
300,0 mln. Rub. |
Investment capacity, mln rubles |
300,0 mln. Rub. |
Conditions of investor participation |
Direct investments, loan funds, other |
Payback period |
4,7 years |
Land characteristics |
Location |
Sportivnaya street, stanitsa Grivenskaya, Kalininskiy district |
Land plot area (m2) |
35000 square meters |
Ground categories |
Agricultural assignment land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From substation 110 kV “Grivenskaya”, overhead power line – 10, Package transformer substation 10/04 kV |
150 |
Gas supply |
From 325 mm pipe, pressure 3 atm |
100 |
Water supply |
From 110 mm pipe |
110 |
Sewerage system |
Projected septic |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Stanitsa Kalininskaya |
42 |
Center of federal subject |
Krasnodar |
107 |
Highway (regional, federal significance) |
Stanitsa Kalininskaya – stanitsa Grivenskaya |
0,05 |
Roads of local significance |
Furmanova street |
1 |
Nearest railway station |
Station “Velichkovka” |
47 |
Nearest railway lines |
Station “Velichkovka” |
47 |
Airport |
Krasnodar |
122 |
Seaport |
Novorossiysk |
187 |