Project name |
Building of the factory to process and conservation of fruits and vegetables |
Location of the project |
Armavir Ñity |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
It is expected to build up a factory to process and conserve fruits and vegetables. The new factory will be equipped with the equipment of leading European companies. It will be a special attention to quality control for the raw material and ready made goods. The technology of production vegetable and fruit tins will supply effective use of raw material, keeping its nutrients during procession, in-line production. |
Project capacity |
There are vacuum-steam installations in the vegetable shop, total capacity of vegetable production is 20 t./day which allows to process annually up to 7 500 tones. In the jam and the vegetable shops it will be an equipment to process pickles, jams, sauces. The capacities of these shops allow to process till 1800 thousand tones of fruit per years. |
Financial estimation of the project |
Total cost of the project, mln rubles |
210 mln.roubles |
Investment capacity, mln rubles |
210 mln.roubles |
Conditions of investor participation |
Direct investments |
Payback period |
4,3 years |
Land characteristics |
Location |
Armavir, the district of the 2 turn of the site development of v. Zavetny. |
Land plot area (m2) |
12 800 m2 |
Ground categories |
Land of settlements |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL 6kWatt |
419 |
Gas supply |
GRS-2 |
1,4 |
Water supply |
D=50 |
467 |
Sewerage system |
A building street drainage D=200 |
469 |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
The central part of Armavir |
6,5 |
Center of federal subject |
Armavir |
250,0 |
Highway (regional, federal significance) |
FAD «Caucasus» |
1,0 |
Roads of local significance |
«Armavir-Îtradnaya» |
Along the board of the site |
Nearest railway station |
Railway station «Armavir-1», Railway station «Armavir-2» |
9,0 , 11,8 |
Nearest railway lines |
|
5,7 |
Airport |
An airport of Krasnodar |
200 |
Seaport |
Novorossijsk |
360 |