Project name |
Construction of a meat processing and packing complex |
Location of the project |
Kalininskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Construction of a modern high-technology meat processing complex with the workshops of pig slaughtering, bone-in meat and smoked products production. |
Financial estimation of the project |
Total cost of the project, mln rubles |
210,5 mln. Rub. |
Investment capacity, mln rubles |
210,5 mln. Rub. |
Conditions of investor participation |
Direct investments, loan funds, other |
Payback period |
4,5 years |
Land characteristics |
Location |
Landside area, stanitsa Kalininskaya, Kalininskiy district |
Land plot area (m2) |
27000 square meters |
Ground categories |
Industrial land |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
From substation 35/10 kV2 Kalininskaya over head power line-10, 10/4kV integrated transformer substation |
50 ě |
Gas supply |
From 325 mm pipe, pressure 6 atm |
65 ě |
Water supply |
Projected artesian well |
- |
Sewerage system |
Projected septic |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Stanitsa Kalininskaya |
3,5 |
Center of federal subject |
Krasnodar |
70 |
Highway (regional, federal significance) |
Timashevsk - Stanitsa Poltavskaya |
25 65 |
Roads of local significance |
- |
- |
Nearest railway station |
Station “Velichkovka” |
1,65 |
Nearest railway lines |
Stanitsa Starovelichkovskaya |
0,25 |
Airport |
Krasnodar |
70 |
Seaport |
Novorossiysk |
140 |