Construction of a cattle-breeding complex and a greenhouse farm

Project name Construction of a cattle-breeding complex and a greenhouse farm
Location of the project Tuapsinskiy district
Industry classification Agriculture
Basic information about the project
Project essence to determine the cost-effectiveness, profitability and payback period of the investment costs.
Project capacity 200 cattle heads.
Financial estimation of the project
Total cost of the project, mln rubles 29,6 million rubles.
Investment capacity, mln rubles 29,6 million rubles.
Conditions of investor participation direct investments.
Payback period 3.50 years
Land characteristics
Location Krasnodar Region, Tuapsinsky District, at the entrance to the village of Goitkh from the side of Tuapse City, right hand side of the access road.
Land plot area (m2) 17 000 sq.m.
Ground categories lands of settlements.
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply a high voltage line VL-10 50 m
Gas supply not required
Water supply d=0.4 50 m
Sewerage system local treatment facilities
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Tuapse City 55.5 km
Center of federal subject Krasnodar City 218.4 km
Highway (regional, federal significance) Tuapse - Maikop 0.5 km
Nearest railway station Tuapse City 55.5 km
Nearest railway lines Tuapse City 55.5 km
Airport Krasnodar City 218.4 km
Seaport Tuapse City 55.5 km
Contact information
Information on project proponent Administration of the Tuapsinsky District Municipality; tel.: +7 (86167) 2-36-13, +7 (86167) 2-10-91; naz.proekttuapse@mail.ru; www.tuapseregion.ru. Department of Agriculture and Processing Industry of the Krasnodar Region; tel./fax: +7 (861) 26