Construction of factory on processing fruit, berries, vegetables and release lactofermented juices, tomato paste, candied fruits, children's meal, ÑÎ2- extracts

Project name Construction of factory on processing fruit, berries, vegetables and release lactofermented juices, tomato paste, candied fruits, children's meal, ÑÎ2- extracts
Location of the project Kalininskiy district
Industry classification Agriculture
Basic information about the project
Project essence The project provides construction of the modern hi-tech processing plant of local fruits, berries.
Project capacity Annual production volume is 46,776 thousand tones
Financial estimation of the project
Total cost of the project, mln rubles 2061,4 mln. Rub.
Investment capacity, mln rubles 2061,4 mln. Rub.
Conditions of investor participation Direct investments, loan funds, other
Payback period 6,75 years
Land characteristics
Location Elevatornaya street, stanitsa Starovelichkovskaya, Kalininskiy district, Krasnodar region, 353793
Land plot area (m2) 50000 square meters
Ground categories Settlement land
Characteristics of existing engineering infrastructure
Infrastructure typeCapacity, diameterDistance to the connection point (m)
Power supply From overhead power line-35, OPL-10, package transformer substation 10/04 kW 300
Gas supply From 325 mm pipe, pressure 6 atm. 320
Water supply From existing systems 110 mm in diameter, 1,6 atm 50
Sewerage system Projected septic ---
Distance up to the large residential places and objects of transport infrastructure
Remoteness fromNameDistance (km)
Municipality center Stanitsa Kalininskaya 6
Center of federal subject Krasnodar 65
Highway (regional, federal significance) Timashevsk –Stanitsa Poltavskaya, Stanitsa Kalininskaya –Stanitsa Novotitarovskaya 2 0,075
Roads of local significance Gorodskaya street 0,075
Nearest railway station Station “Velichkovka” 2,5
Nearest railway lines Stanitsa Starovelichkovskaya 1
Airport Krasnodar 70
Seaport Novorossiysk 145