Project name |
Construction mini-food combine (production meat, vege-table half-finished item) in farm Kulikovskiy |
Location of the project |
Leningradskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Production and realization half-finished item: meat dum-plings, with potatoes, cabbage, mushroom, |
Project capacity |
5 tys.tn |
Financial estimation of the project |
Total cost of the project, mln rubles |
21.0 mln. rub. |
Investment capacity, mln rubles |
21.0 mln. rub. |
Conditions of investor participation |
Direct investments - 100% facility of the investor |
Payback period |
3 years 8 monats |
Land characteristics |
Location |
Krasnodar region, Leningradskiy district, farm Kulikovs-kiy, str. Octyabrskaya |
Land plot area (m2) |
10 000 m2 |
Ground categories |
Lands of the populated points |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-10KV |
10ì |
Gas supply |
Gasmain of the average pressure O-219mm |
30 |
Water supply |
O-150 mm |
30ì |
Sewerage system |
is absent |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Leningradskaya village |
11 |
Center of federal subject |
Krasnodar city |
197 |
Highway (regional, federal significance) |
marginal importance |
2 |
Roads of local significance |
|
0,02 |
Nearest railway station |
Kislyakovskaya village |
8 |
Nearest railway lines |
Kislyakovskaya village |
8 |
Airport |
ROSTOV-on-Donu city |
112 |
Seaport |
Eysk city |
113 |