Project name |
Ñonstruction mini-plant on production of the soya prod-ucts in Pervomayskoe rural settling |
Location of the project |
Leningradskiy district |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Production and realization of the soya products: soya flour, soya milk, soya pot cheese, cheese(òîfu), mayon-naise |
Project capacity |
5 tys.tn finished products per annum |
Financial estimation of the project |
Total cost of the project, mln rubles |
30.0 mln. rub. |
Investment capacity, mln rubles |
30.0 mln. rub. |
Conditions of investor participation |
Direct investments - 100% facility of the investor |
Payback period |
4 years 4 monats |
Land characteristics |
Location |
Krasnodar region, Leningradskiy district, farm Pervo-mayskiy |
Land plot area (m2) |
5 000 m2 |
Ground categories |
Lands of the populated points |
Characteristics of existing engineering infrastructure |
Infrastructure type | Capacity, diameter | Distance to the connection point (m) |
Power supply |
VL-10KV |
156,0 |
Gas supply |
Gasmain of the average pressure |
196,0 |
Water supply |
Artesian wells |
227,0 |
Sewerage system |
is absent |
- |
Distance up to the large residential places and objects of transport infrastructure |
Remoteness from | Name | Distance (km) |
Municipality center |
Leningradskaya village |
22,0 |
Center of federal subject |
Krasnodar city |
197,0 |
Highway (regional, federal significance) |
marginal importance |
1,0 |
Roads of local significance |
|
0,02 |
Nearest railway station |
Kanevskaya village |
38,0 |
Nearest railway lines |
Kanevskaya village |
38,0 |
Airport |
ROSTOV-on-Donu city |
142,0 |
Seaport |
Eysk city |
125,0 |